Photo Album: Bathroom Remodeling Project
-
Bathroom: The Home Stretch
ProSource Construction
-
Bathroom: The Home Stretch
The bathroom project is nearing completion! We only need to get the trim and tile up and we’re done! ProSource Construction
-
Bathroom: During 4
The walls are painted! Next step is to put the baseboards and ceiling trim up and then bring all of the fixtures back in. ProSource Construction
-
Bathroom: During 3
The greenboard and durock are up! Now we’ve just got to get the walls primed and ready for paint. ProSource Construction
-
Bathroom: During 2
The hole in the house is closed, the tub is installed and the floor is down! Yipee! ProSource Construction
-
The Hole
I’ll have to admit, it’s a little alarming to see a gaping hole in the side of your house. At least it was done on purpose. ProSource Construction
-
Hole in the Home
Our bathroom remodeling project took an unexpected turn when we discovered some extensive water damage behind our shower tile.
-
Making a whole where the water got in
Rick of ProSource Construction removes the siding from the wet area of the wall so it can be removed and replaced. ProSource Construction
-
Bathroom: During
After all of the demolition was done we found out that the outside wall (the wall under the window) had a good amount of water damage. The insulation and the outside wall were both saturated and the outside wall was soft enough to move with your hand. ProSource Construction
-
Bathroom: Before
Our bathroom before we started the remodeling project.