Photo Album: Office Remodel

  • Workspace

    Workspace

    The workspace

  • Office: about 95% completed!

    Office: about 95% completed!

    Here’s an updated photo of the office. I’m back in here working and it’s wonderful! We only have a couple of items which aren’t finished; The fireplace is tiled and the bookcases and mantle are being built, we’re waiting on the new replacement window to arrive and we still have some baseboard and trim that…

  • Office, about 1-2 weeks from completion

    Office, about 1-2 weeks from completion

    A few more loose ends remaining, but it’s coming together! www.prosourcefirst.com

  • Office storage system

    Office storage system

    After much deliberation and comparison we decided to go with the Ikea Besta line. We have 6 drawers, 2 frosted glass doors and 1 sliding door.

  • Office seating area

    Office seating area

    We wanted to create a sitting area in the office and decided to get 2 Tullsta chairs, a small table and a shag rug from Ikea.

  • Office Floor

    Office Floor

  • Office floor is finished!

    Office floor is finished!

    The installation of the Asian Walnut floor in the office is completed!

  • Office floor

    Office floor

    The office floor is being installed and I’m thrilled with the results so far!

  • Floor membrane is on!

    Floor membrane is on!

    After we discovered that the moisture level of our concrete slab under the office was a tiny bit above the recommended levels for a wood floor we decided to have it sealed before applying the floor. Today that process was finished and tomorrow the floor install will begin.

  • Office update

    Office update

    We had a couple of unexpected delays (of course) but here’s the current state of the office. All o the outlets/switches are hooked up and the networking is all finished too. We also installed the ceiling fan and put the rings into the ceiling lights. www.prosourcefirst.com