Shutter Speed: 0.033 sec (1/30)

  • Grouting: Finished

    Grouting: Finished

    The grout is up and this time tomorrow we’ll be able to use the shower for the first time in over a month ProSource Construction

  • Grouting: Finished

    Grouting: Finished

    The grout it up and this time tomorrow we’ll be able to use the shower for the first time in over a month ProSource Construction

  • Tile: Finished

    Tile: Finished

    The tile is all up, all that’s left now is the grouting, which happens today! ProSource Construction

  • Tile: Finished!

    Tile: Finished!

    The tile is all up, all that’s left now is the grouting, which happens today! ProSource Construction

  • Bathroom: Tile

    Bathroom: Tile

    Almost all of the tile is in place, hopefully we’ll be able to grout starting on Monday! ProSource Construction

  • Bathroom: The Home Stretch

    Bathroom: The Home Stretch

    ProSource Construction

  • Bathroom: The Home Stretch

    Bathroom: The Home Stretch

    The bathroom project is nearing completion! We only need to get the trim and tile up and we’re done! ProSource Construction

  • Bathroom: During 3

    Bathroom: During 3

    The greenboard and durock are up! Now we’ve just got to get the walls primed and ready for paint. ProSource Construction

  • My current office setup

    My current office setup

    My current desk setup in the office. From left to right: 17" MacBook Pro 2.33Ghz, 3gb RAM Dell 17" Display Apple 20" Cinema Display Apple Dual 2.0Ghz PowerMac G5, 10gb RAM On top of PowerMac is an Iomega 1TB backup drive which I use for work backup and video storage. UPDATE (2/11/2008): 2nd 20" Apple…

  • Bathroom: During

    Bathroom: During

    After all of the demolition was done we found out that the outside wall (the wall under the window) had a good amount of water damage. The insulation and the outside wall were both saturated and the outside wall was soft enough to move with your hand. ProSource Construction