Shutter Speed: 0.067 sec (1/15)

  • Some office adjustments

    Some office adjustments

    Did a mostly behind-the-scenes overhaul of the office. Ended up getting rid of the top 2 sections of the storage cabinet as it was way too tall. The result is a little less storage space, but a room that feels much larger. Also got new chair mats for both office chairs. Here’s what the storage…

  • In-wall networking box

    In-wall networking box

    Here’s the new in-wall box where the routers, dsl modem, etc will be stored. All of the wall plate network connections will terminate in this box. Look ma, no wires!

  • Day 4

    Day 4

    Office Remodel Day 4. It doesn’t look like a lot has happened but we ran into a minor electrical issue and had to get that fixed before we went further. I did manage to get all of the office wiring ran though, which was awesome.

  • Day 1

    Day 1

    Almost all of the paneling has been removed, the tiles and drywall has been removed from the ceiling and the fireplace mantle has been taken down. www.prosourcefirst.com

  • Day 1

    Day 1

    Almost all of the paneling has been removed, the tiles and drywall has been removed from the ceiling and the fireplace mantle has been taken down. www.prosourcefirst.com

  • Wide shot with the GoPro HD Hero

    Wide shot with the GoPro HD Hero

    Does this camera make my head look big? No, my head does.

  • The LOST Mystery Podcast with Anton & Evan

    The LOST Mystery Podcast with Anton & Evan

    Anton (left) and I recording an episode of the Lost Mystery Podcast with Anton and Evan LostMysteryPodcast.com

  • Work (and oatmeal)

    Work (and oatmeal)

  • Kitchen Cabinets after 1st Coat

    Kitchen Cabinets after 1st Coat

    The first coat of paint made a big difference in the lightness of the kitchen, but that avocado green was going to be hard to cover up.

  • The Parlor (for now)

    The Parlor (for now)

    Still haven’t decided what all we’re going to do with this room.